Projects

Rudder Ram In-Water Replacement

Shearwater Marine Services (Shearwater) successfully completed an in-water repair of the Rudder Ram on a subsea vessel, a first-of-its-kind accomplishment. The initial plan to use a Rudder Cofferdam for dry access was not feasible, leading to the development of a collaborative and innovative solution involving multiple diving teams and stakeholders. The repair was completed in a challenging environment, with meticulous planning and execution, ultimately finishing only two days over the scheduled timeline.

INTRODUCTION

When an issue with the hydraulic system of a platform's rudder was discovered, resulting in sea water contamination, Shearwater mobilised to support with the solution. The initial plan was to investigate this defect using a Rudder Cofferdam, however this could not be fitted successfully. Shearwater developed an alternative solution that involved diver entry into a restricted free flood space.

CHALLENGE

The challenge was to carry out the in-water repair of the Rudder Ram, given that the Rudder Cofferdam could not be fitted. The repair involved a series of complex tasks that had never been conducted in-water before, requiring innovative solutions, meticulous planning, and collaboration across various stakeholders.

SOLUTION

SMS and its partners developed a first-of-its-kind in-water repair solution, which included the following key steps:

1. Investigation and repair timeline: Shearwater carried out various activities, including ROV and diver entry, hydraulic leak detection and repair, in-water repair of the Rudder Ram, sourcing a replacement Rudder Ram, and successful pressure testing after the repair.

2. Repair methodology: The repair process involved removing the defective Ram, workshop activities to prepare the new Ram, and fitting the replacement Ram.

RESULTS

Shearwater successfully completed the in-water repair of the Rudder Ram, overcoming numerous challenges, such as:

• Ram internal slinging within the space

• Slinging of Rudder Ram in/out of the housing

• Tiller Pin Nut removal

• Pilgrim Nuts removal

• Hydraulic Swagelok connections

• Fitting of Bearing Top Hats to the new Ram

• Strength Testing of eye bolts and cleats within the space

CONCLUSION

Shearwater Marine Services demonstrated exceptional expertise, dedication, and innovation in completing this first-ever in-water repair of the Rudder Ram. By working closely with multiple stakeholders and diving teams, and overcoming numerous challenges, Shearwater delivered a successful repair that was only two days over the scheduled timeline. This case study showcases the capabilities of Shearwater in providing innovative and effective solutions in challenging environments.

Find out how Shearwater
Can Support You

Heading

Heading

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat. Aenean faucibus nibh et justo cursus id rutrum lorem imperdiet. Nunc ut sem vitae risus tristique posuere.

Heading 1

Heading 2

Heading 3

Heading 4

Heading 5
Heading 6

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Block quote

Ordered list

  1. Item 1
  2. Item 2
  3. Item 3

Unordered list

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Find out how Shearwater
Can Support You